Oil Region Astronomical Society
  • Home
    • Buy an ORAS T-shirt!
  • About ORAS
    • Members
  • Events and Outreach
    • About Events
    • ORAS Calendar of Events 2025
    • Binocular Loan Program
    • IAU Pro-Am Workshop
    • ORAS Workshops
  • Observatory
    • Observatory Project
    • Outdoor Classroom Project
    • Directions to the Observatory
    • ORAS AllSkEye Camera
    • Guidelines for Observatory Use
  • ASTROBLAST
    • About ASTROBLAST
    • ASTROBLAST 2025 Events Schedule
    • ASTROBLAST Registration
    • ASTROBLAST Group Photos
    • ASTROBLAST Door Prizes
    • Bill-Yum's Good Eats menu
  • Resources
    • Astro News
    • Tools
    • Beginners
    • Certificates
  • Join ORAS
  • Giving
  • Non-clickable Page

Outdoor Classroom Project

Picture
In late May of 2025, ORAS broke ground on a new addition to our site -- an outdoor classroom and storage building, which will include two restrooms, each with a shower.  The project will include installation of some additional power pedestals as well.  We would like to thank the McElhattan Foundation of Pittsburgh for its generous support!

Check out our progress in the photo's below. If you have questions or would like to help or provide additional support, please visit the ORAS Giving Page.
Picture
Outdoor Classroom rendering by Jordan Spuck.
Picture
Digging the trench went much better than expected, because the ground was not nearly as rocky as anticipated.
Picture
The service lines will contain conduits for electric, fiber optics, water, and sewer service.
Picture
This photo shows the process of backfilling the trench.
Picture
This is the site of the future outdoor classroom building, before installing the footers and the pad.
Picture
We've added 20 feet to the "bridge" across the culvert into the west field. This will improve the access for larger trailers.
Picture
Excavating the location for the new outdoor classroom.
Picture
Concrete pad, french drains, and landscaping is now complete. Roof trusses have been delivered. Construction of the structure will begin soon! (July 10, 2025)
Picture
We are taking advantage of the wait time needed for the concrete pad to cure. We've removed the wall in the Jones Building, increasing the size of our indoor classroom space. This will increase our capacity from 30 people to 60+. This will allow us to significantly expand our programming.

Picture
This is a photo of the outdoor classroom from October 2025, looking more or less east. The back of the observatory building is visible to the rear.

Picture
This photo shows the outdoor classroom looking south, again from October 2025. A garage door has since been installed on this building.

Picture
This is one of the two rest rooms/shower rooms in the new building. We now have indoor plumbing within easy range of the observatory!
  • Home
    • Buy an ORAS T-shirt!
  • About ORAS
    • Members
  • Events and Outreach
    • About Events
    • ORAS Calendar of Events 2025
    • Binocular Loan Program
    • IAU Pro-Am Workshop
    • ORAS Workshops
  • Observatory
    • Observatory Project
    • Outdoor Classroom Project
    • Directions to the Observatory
    • ORAS AllSkEye Camera
    • Guidelines for Observatory Use
  • ASTROBLAST
    • About ASTROBLAST
    • ASTROBLAST 2025 Events Schedule
    • ASTROBLAST Registration
    • ASTROBLAST Group Photos
    • ASTROBLAST Door Prizes
    • Bill-Yum's Good Eats menu
  • Resources
    • Astro News
    • Tools
    • Beginners
    • Certificates
  • Join ORAS
  • Giving
  • Non-clickable Page